Question 110

The current project covers a multimedia campus where real-time collaboration suffers despite high received signal levels. The central concern is to preserve voice and video performance during wireless contention. Which technical-proposal statement gives a defensible design decision and discloses the relevant dependency?

  1. Propose AP platform selection with required IoT radios and compatible integrations; justify it through some Aruba AP families incorporate Bluetooth and IEEE 802.15.4 capability; flag that third-party sensor gateway integration is not validated
  2. Propose redundant gateway cluster sized for survivable load; justify it through gateway clustering removes a single device failure point when capacity and traffic paths are planned; flag that surviving gateway capacity under peak load has not been measured
  3. Propose end-to-end QoS and WMM mapping with appropriate DSCP trust; justify it through airtime prioritization and wired queue treatment must agree to protect delay-sensitive flows; flag that existing endpoint DSCP markings may not be trustworthy
  4. Propose ClearPass-assisted wireless onboarding with identity-based roles; justify it through onboarding and AAA decisions let user identity drive authorized access; flag that the residence identity source may lack reliable entitlement attributes
  5. Propose AOS-10 mixed forwarding design after policy-support validation; justify it through mixed mode can combine local bridging and gateway tunneling for a WLAN according to policy; flag that some existing AP and gateway releases may lack the selected forwarding behavior

Explanation

Correct Answer

C:

The proposal for end-to-end QoS and WMM mapping with appropriate DSCP trust connects the chosen approach to its technical mechanism and identifies that existing endpoint DSCP markings may not be trustworthy. The plan is technically defensible because airtime prioritization and wired queue treatment must agree to protect delay-sensitive flows; the architect should cite DSCP mapping captures and packet delay and jitter baselines before final design sign-off.

Incorrect Answers

A:

That written approach has a valid rationale for support RF services beyond Wi-Fi in planned locations, but its scope misses the decision now being justified; for technical proposal drafting, the present document must specify end-to-end QoS and WMM mapping with appropriate DSCP trust, and a signable document instead needs end-to-end QoS and WMM mapping with appropriate DSCP trust and explicit resolution of existing endpoint DSCP markings may not be trustworthy, which the suggested AP platform selection with required IoT radios and compatible integrations statement does not supply.

B:

That written approach has a valid rationale for allow maintenance without interrupting production tunneled WLANs, but its scope misses the decision now being justified; for technical proposal drafting, the present document must specify end-to-end QoS and WMM mapping with appropriate DSCP trust, and a signable document instead needs end-to-end QoS and WMM mapping with appropriate DSCP trust and explicit resolution of existing endpoint DSCP markings may not be trustworthy, which the suggested redundant gateway cluster sized for survivable load statement does not supply.

D:

That written approach has a valid rationale for authenticate eligible residents and confine unregistered devices, but its scope misses the decision now being justified; for technical proposal drafting, the present document must specify end-to-end QoS and WMM mapping with appropriate DSCP trust, and a signable document instead needs end-to-end QoS and WMM mapping with appropriate DSCP trust and explicit resolution of existing endpoint DSCP markings may not be trustworthy, which the suggested ClearPass-assisted wireless onboarding with identity-based roles statement does not supply.

E:

That written approach has a valid rationale for select forwarding per user policy without multiplying SSIDs, but its scope misses the decision now being justified; for technical proposal drafting, the present document must specify end-to-end QoS and WMM mapping with appropriate DSCP trust, and a signable document instead needs end-to-end QoS and WMM mapping with appropriate DSCP trust and explicit resolution of existing endpoint DSCP markings may not be trustworthy, which the suggested AOS-10 mixed forwarding design after policy-support validation statement does not supply.

Question 111

During a campus access design for a university offering temporary conference visitor connectivity, the team must issue expiring guest access without maintaining permanent identities. Which TWO elements must be included in the proposed architecture and procurement scope to support the stated requirement? Choose TWO.

  1. Specify ClearPass TACACS+ device-administration policy
  2. Specify centralized role-based policy with ClearPass and compatible enforcement points
  3. Specify ClearPass Guest or appropriately scoped visitor onboarding
  4. Budget for RADIUS service capacity, certificates and integration effort
  5. Budget for guest onboarding entitlement and portal customization services

Explanation

Correct Answers

C:

This is the substantive network decision: time-bounded guest identity and policy can separate visitors from managed users. It addresses the requested outcome to issue expiring guest access without maintaining permanent identities, subject to the noted constraints.

E:

The scope of guest onboarding entitlement and portal customization services must be purchasable and deliverable; otherwise the selected topology remains a drawing. These scope items enable the selected design and support testing through automatic account expiry and internal-network denial.

Incorrect Answers

A:

The suggested method is appropriate when a customer must control privileged switch actions with accountable identities, because central AAA for device administration can distinguish operator permissions from endpoint network access; for preliminary topology and bill planning, the immediate technical objective is to issue expiring guest access without maintaining permanent identities, and the needed approach is ClearPass Guest or appropriately scoped visitor onboarding, not ClearPass TACACS+ device-administration policy, because the customer requires issue expiring guest access without maintaining permanent identities.

B:

The suggested method is appropriate when a customer must apply consistent least-privilege policy regardless of connection medium, because policy can follow authenticated identity rather than a fixed switch port or SSID; for preliminary topology and bill planning, the immediate technical objective is to issue expiring guest access without maintaining permanent identities, and the needed approach is ClearPass Guest or appropriately scoped visitor onboarding, not centralized role-based policy with ClearPass and compatible enforcement points, because the customer requires issue expiring guest access without maintaining permanent identities.

D:

That procurement dependency supports bind network authorization to named users and managed devices; it does not establish what is required to implement the chosen design; for preliminary topology and bill planning, the selected build instead depends on guest onboarding entitlement and portal customization services, and the required procurement provision is guest onboarding entitlement and portal customization services, whereas ordering for 802.1X enterprise authentication integrated with ClearPass Policy Manager would not close the current delivery gap.

Question 112

During a campus access design for a student residence offering a self-service onboarding network for personally owned devices, the team must authenticate eligible residents and confine unregistered devices. Which HPE Aruba Networking design approach MOST directly addresses the requirement?

  1. Use AOS-10 mixed forwarding design after policy-support validation
  2. Use AP platform selection with required IoT radios and compatible integrations
  3. Use redundant gateway cluster sized for survivable load
  4. Use ClearPass-assisted wireless onboarding with identity-based roles

Explanation

Correct Answer

D:

The architecture works because onboarding and AAA decisions let user identity drive authorized access; this is a direct response to the need to authenticate eligible residents and confine unregistered devices; the design must still check identity directory attributes and onboarding journey observation before selecting exact hardware or policy settings.

Incorrect Answers

A:

The suggested method is appropriate when a customer must select forwarding per user policy without multiplying SSIDs, because mixed mode can combine local bridging and gateway tunneling for a WLAN according to policy; for technology selection, the immediate technical objective is to authenticate eligible residents and confine unregistered devices, and the needed approach is ClearPass-assisted wireless onboarding with identity-based roles, not AOS-10 mixed forwarding design after policy-support validation, because the customer requires authenticate eligible residents and confine unregistered devices.

B:

The suggested method is appropriate when a customer must support RF services beyond Wi-Fi in planned locations, because some Aruba AP families incorporate Bluetooth and IEEE 802.15.4 capability; for technology selection, the immediate technical objective is to authenticate eligible residents and confine unregistered devices, and the needed approach is ClearPass-assisted wireless onboarding with identity-based roles, not AP platform selection with required IoT radios and compatible integrations, because the customer requires authenticate eligible residents and confine unregistered devices.

C:

The suggested method is appropriate when a customer must allow maintenance without interrupting production tunneled WLANs, because gateway clustering removes a single device failure point when capacity and traffic paths are planned; for technology selection, the immediate technical objective is to authenticate eligible residents and confine unregistered devices, and the needed approach is ClearPass-assisted wireless onboarding with identity-based roles, not redundant gateway cluster sized for survivable load, because the customer requires authenticate eligible residents and confine unregistered devices.

Question 113

For a commercial property owner comparing centralized gateways with local forwarding, stakeholders have prioritized the need to justify the lifecycle trade-off rather than only equipment purchase price. Which item or service scope belongs in the FINAL BoM for the selected design?

  1. Include paired core systems, diverse links and support coverage
  2. Include priced base items plus separately identified contingency allowances
  3. Include costed architecture option set with implementation and support estimates
  4. Include scenario-specific gateway and subscription alternatives

Explanation

Correct Answer

D:

This provision enables option analysis of bridge and tunnel modes against agreed objectives; the underlying reason is that different forwarding modes shift inspection, operations and gateway costs. The final bill must reconcile exact part or service quantities with five-year gateway, connectivity, support and staffing estimates and the signed acceptance threshold, rather than copying a generic product list.

Incorrect Answers

A:

That procurement dependency supports make the availability value of redundant infrastructure explicit; it does not establish what is required to implement the chosen design; for final procurement reconciliation, the selected build instead depends on scenario-specific gateway and subscription alternatives, and the required procurement provision is scenario-specific gateway and subscription alternatives, whereas ordering for redundant campus architecture justified by critical service continuity would not close the current delivery gap.

B:

That procurement dependency supports separate binding prices from unverified demand assumptions; it does not establish what is required to implement the chosen design; for final procurement reconciliation, the selected build instead depends on scenario-specific gateway and subscription alternatives, and the required procurement provision is scenario-specific gateway and subscription alternatives, whereas ordering for a conditional BoM with quantified assumptions and change control would not close the current delivery gap.

C:

That procurement dependency supports summarize business goals without concealing key risks and dependencies; it does not establish what is required to implement the chosen design; for final procurement reconciliation, the selected build instead depends on scenario-specific gateway and subscription alternatives, and the required procurement provision is scenario-specific gateway and subscription alternatives, whereas ordering for executive brief linking architecture options to outcomes and trade-offs would not close the current delivery gap.

Question 114

The current project covers a hospital with isolated lab subnetworks that must not leak routes into guest services. The central concern is to maintain independent routing policy for sensitive wired zones. Which sequence best represents the functional workflow that the architect should diagram?

  1. Document closet counts, uplink demand and fiber connectivity diagrams → design a two-tier collapsed-core design with redundant AOS-CX switching → verify single-core outage and uplink failover tests
  2. Document traffic bursts, queue drops and DSCP markings at uplinks → design uplink capacity planning combined with end-to-end DSCP-aware QoS → verify voice quality, queue counters and utilization under stress
  3. Document existing routing tables and reachability between zone boundaries → design VRF-based campus macrosegmentation with explicit service handoff → verify route visibility and approved cross-zone application tests
  4. Document camera bitrates, burst factors and existing link utilization → design oversubscription-aware switch and uplink selection → verify full-stream throughput and queue-drop counters during peak recording

Explanation

Correct Answer

C:

The workflow starts with existing routing tables and reachability between zone boundaries, applies the needed service mechanism, and ends with route visibility and approved cross-zone application tests. Specifically, separate VRFs maintain distinct forwarding tables until controlled route exchange is configured, and this order avoids treating deployment as proof of success.

Incorrect Answers

A:

Those stages model the dependency chain for deliver core redundancy without an unnecessary dedicated aggregation tier, not the service path in the present design; for functional workflow mapping, the required stages must address VRF-based campus macrosegmentation with explicit service handoff, and the appropriate chain is existing routing tables and reachability between zone boundaries through VRF-based campus macrosegmentation with explicit service handoff to route visibility and approved cross-zone application tests, rather than the unrelated a two-tier collapsed-core design with redundant AOS-CX switching path.

B:

Those stages model the dependency chain for meet voice delay budgets without hiding an undersized uplink, not the service path in the present design; for functional workflow mapping, the required stages must address VRF-based campus macrosegmentation with explicit service handoff, and the appropriate chain is existing routing tables and reachability between zone boundaries through VRF-based campus macrosegmentation with explicit service handoff to route visibility and approved cross-zone application tests, rather than the unrelated uplink capacity planning combined with end-to-end DSCP-aware QoS path.

D:

Those stages model the dependency chain for prevent access uplinks from becoming a bottleneck during recording peaks, not the service path in the present design; for functional workflow mapping, the required stages must address VRF-based campus macrosegmentation with explicit service handoff, and the appropriate chain is existing routing tables and reachability between zone boundaries through VRF-based campus macrosegmentation with explicit service handoff to route visibility and approved cross-zone application tests, rather than the unrelated oversubscription-aware switch and uplink selection path.

Question 115

A solution architect is assessing a retailer with hundreds of switches reaching vendor support renewal dates at different times, with a requirement to avoid management and support coverage gaps across distributed sites. Which implementation or migration guideline most directly reduces the specified cutover risk?

  1. Plan to test API calls in a nonproduction network group
  2. Plan to simulate a core-link fault and review alert propagation
  3. Plan to reconcile inventory before ordering renewals or replacements
  4. Plan to run a support-team pilot using archived incident examples

Explanation

Correct Answer

C:

This stage limits exposure while the critical design premise is being checked: some devices are mapped to the wrong procurement cost center. The recommended technical approach is lifecycle and entitlement tracking joined to network inventory; verify renewal coverage checked against active managed inventory at the planned gate before extending change scope.

Incorrect Answers

A:

That rollout order reduces risks when the project must avoid unmanaged manual edits while retaining rollback control, not the known transition hazard in this location; for migration sequence design, this cutover must instead plan to reconcile inventory before ordering renewals or replacements, and the controlled action for this cutover is to reconcile inventory before ordering renewals or replacements; the unrelated test API calls in a nonproduction network group step does not reduce its dependency risk.

B:

That rollout order reduces risks when the project must correlate incident evidence and prioritize customer-impacting faults, not the known transition hazard in this location; for migration sequence design, this cutover must instead plan to reconcile inventory before ordering renewals or replacements, and the controlled action for this cutover is to reconcile inventory before ordering renewals or replacements; the unrelated simulate a core-link fault and review alert propagation step does not reduce its dependency risk.

D:

That rollout order reduces risks when the project must shorten time to localize wireless access incidents, not the known transition hazard in this location; for migration sequence design, this cutover must instead plan to reconcile inventory before ordering renewals or replacements, and the controlled action for this cutover is to reconcile inventory before ordering renewals or replacements; the unrelated run a support-team pilot using archived incident examples step does not reduce its dependency risk.

Question 116

Consider a field operations building with unstable mains power. The customer asks the architect to maintain campus access during short facility power outages. Which item or service scope belongs in the FINAL BoM for the selected design?

  1. Include UPS capacity, PDU feeds and supported redundant power options
  2. Include surge protectors, outdoor cabling and approved grounding accessories
  3. Include patch panels, racks, cable pathways and possible additional access switches
  4. Include secondary network ports or alternate attachment and independent UPS feeds
  5. Include approved transceiver models, patch cords and cleaning supplies

Explanation

Correct Answer

A:

This provision enables UPS and redundant-power planning for network closets; the underlying reason is that network availability depends on sustained power to switches and upstream devices. The final bill must reconcile exact part or service quantities with power-failure history, switch draw and available UPS runtime and the signed acceptance threshold, rather than copying a generic product list.

Incorrect Answers

B:

That procurement dependency supports reduce equipment damage and safety risk from surges; it does not establish what is required to implement the chosen design; for final procurement reconciliation, the selected build instead depends on UPS capacity, PDU feeds and supported redundant power options, and the required procurement provision is UPS capacity, PDU feeds and supported redundant power options, whereas ordering for environmentally suitable mounting and surge-protection design would not close the current delivery gap.

C:

That procurement dependency supports keep horizontal copper runs within structured cabling design limits; it does not establish what is required to implement the chosen design; for final procurement reconciliation, the selected build instead depends on UPS capacity, PDU feeds and supported redundant power options, and the required procurement provision is UPS capacity, PDU feeds and supported redundant power options, whereas ordering for additional telecom-room placement based on cable pathway reach would not close the current delivery gap.

D:

That procurement dependency supports remove routine maintenance as a single-point outage for critical ports; it does not establish what is required to implement the chosen design; for final procurement reconciliation, the selected build instead depends on UPS capacity, PDU feeds and supported redundant power options, and the required procurement provision is UPS capacity, PDU feeds and supported redundant power options, whereas ordering for redundant access service zones with independent power paths where required would not close the current delivery gap.

E:

That procurement dependency supports avoid optical reach and transceiver mismatches during a switching refresh; it does not establish what is required to implement the chosen design; for final procurement reconciliation, the selected build instead depends on UPS capacity, PDU feeds and supported redundant power options, and the required procurement provision is UPS capacity, PDU feeds and supported redundant power options, whereas ordering for fiber-plant validation and correctly matched transceiver selection would not close the current delivery gap.

Question 117

A customer scenario involves a newly renovated floor adding high-power wireless access points. The design objective is to avoid under-powering AP radios and uplink functions. Which current-environment evidence should be collected FIRST to avoid basing the design on an unverified condition?

  1. Collect and analyze per-AP negotiated power requirements and existing PoE budgets
  2. Collect and analyze AP port requirements and measured uplink goodput
  3. Collect and analyze rack ambient temperature, airflow and contaminant observations
  4. Collect and analyze used and free port inventory by closet and planned endpoint locations

Explanation

Correct Answer

A:

The target is to avoid under-powering AP radios and uplink functions, so this is the direct baseline for sizing and evaluating the design. Port capability and total available poe power are separate constraints Without these observations, the team cannot distinguish an actual capacity or compatibility limit from an assumption.

Incorrect Answers

B:

Those observations could inform a different requirement to prevent a 1 GbE access link from constraining high-capacity AP traffic, yet they do not measure the condition that makes avoid under-powering AP radios and uplink functions difficult; for current-state inventory analysis, this survey must first establish per-AP negotiated power requirements and existing PoE budgets, and collecting AP port requirements and measured uplink goodput does not establish the requested baseline: per-AP negotiated power requirements and existing PoE budgets.

C:

Those observations could inform a different requirement to choose networking equipment supportable within environmental limits, yet they do not measure the condition that makes avoid under-powering AP radios and uplink functions difficult; for current-state inventory analysis, this survey must first establish per-AP negotiated power requirements and existing PoE budgets, and collecting rack ambient temperature, airflow and contaminant observations does not establish the requested baseline: per-AP negotiated power requirements and existing PoE budgets.

D:

Those observations could inform a different requirement to avoid overlooking patch-panel and physical port capacity, yet they do not measure the condition that makes avoid under-powering AP radios and uplink functions difficult; for current-state inventory analysis, this survey must first establish per-AP negotiated power requirements and existing PoE budgets, and collecting used and free port inventory by closet and planned endpoint locations does not establish the requested baseline: per-AP negotiated power requirements and existing PoE budgets.

Question 118

A customer scenario involves a medical device network that cannot use enterprise 802.1X certificates. The design objective is to provide controlled connectivity to known devices while excluding unknown MACs. Which executive-brief message most clearly connects this architecture investment to the business need?

  1. The project aims for reduced operational downtime during maintenance, proven by live failover with application reachability intact
  2. The project aims for simpler guest traffic paths and predictable internet performance, proven by trace guest traffic to local breakout and prove internal access denied
  3. The project aims for connected clinical equipment with bounded security exposure, proven by allowed clinical flows and blocked lateral access
  4. The project aims for lower disruption for mobile employees, proven by continuous application sessions through inter-building roaming

Explanation

Correct Answer

C:

Sponsors are buying a measurable outcome, not only a device feature. The promised benefit is connected clinical equipment with bounded security exposure, and the acceptance evidence is allowed clinical flows and blocked lateral access; the proposal should also disclose that the vendor may change hardware MACs during repairs before presenting a firm schedule or price.

Incorrect Answers

A:

The benefit belongs to a different initiative focused on allow maintenance without interrupting production tunneled WLANs, so it is not evidence for the requested investment; for executive outcome briefing, this board decision is about connected clinical equipment with bounded security exposure, and in this proposal the investment must support connected clinical equipment with bounded security exposure, rather than the return described for redundant gateway cluster sized for survivable load.

B:

The benefit belongs to a different initiative focused on avoid central backhaul for visitor internet while enforcing visitor isolation, so it is not evidence for the requested investment; for executive outcome briefing, this board decision is about connected clinical equipment with bounded security exposure, and in this proposal the investment must support connected clinical equipment with bounded security exposure, rather than the return described for AOS-10 AP bridged forwarding with guest access policy.

D:

The benefit belongs to a different initiative focused on maintain a consistent roaming domain with centralized policy inspection, so it is not evidence for the requested investment; for executive outcome briefing, this board decision is about connected clinical equipment with bounded security exposure, and in this proposal the investment must support connected clinical equipment with bounded security exposure, rather than the return described for AOS-10 tunneled SSIDs terminating on resilient gateway infrastructure.

Question 119

The current project covers a multinational operation collecting access logs for incident investigation. The central concern is to retain time-correlated evidence across WLAN, NAC and switch components. Which item or service scope belongs in the FINAL BoM for the selected design?

  1. Include Central monitoring access and operational role training
  2. Include log collector integration and network time-service reachability
  3. Include monitoring retention and capacity-reporting effort
  4. Include telemetry collection configuration and NOC workflow training
  5. Include correct license subscriptions and maintenance renewals per device

Explanation

Correct Answer

B:

This provision enables enterprise NTP and centralized logging integration; the underlying reason is that time synchronization makes cross-device event sequences meaningful during investigations. The final bill must reconcile exact part or service quantities with NTP configuration, log source list and SIEM ingestion mappings and the signed acceptance threshold, rather than copying a generic product list.

Incorrect Answers

A:

That procurement dependency supports shorten time to localize wireless access incidents; it does not establish what is required to implement the chosen design; for final procurement reconciliation, the selected build instead depends on log collector integration and network time-service reachability, and the required procurement provision is log collector integration and network time-service reachability, whereas ordering for Central client troubleshooting and correlated telemetry workflows would not close the current delivery gap.

C:

That procurement dependency supports project future switch and WLAN capacity from measured utilization; it does not establish what is required to implement the chosen design; for final procurement reconciliation, the selected build instead depends on log collector integration and network time-service reachability, and the required procurement provision is log collector integration and network time-service reachability, whereas ordering for telemetry-based capacity reporting in Central and related analytics would not close the current delivery gap.

D:

That procurement dependency supports correlate incident evidence and prioritize customer-impacting faults; it does not establish what is required to implement the chosen design; for final procurement reconciliation, the selected build instead depends on log collector integration and network time-service reachability, and the required procurement provision is log collector integration and network time-service reachability, whereas ordering for Central topology correlation combined with a documented incident workflow would not close the current delivery gap.

E:

That procurement dependency supports avoid management and support coverage gaps across distributed sites; it does not establish what is required to implement the chosen design; for final procurement reconciliation, the selected build instead depends on log collector integration and network time-service reachability, and the required procurement provision is log collector integration and network time-service reachability, whereas ordering for lifecycle and entitlement tracking joined to network inventory would not close the current delivery gap.

Question 120

The current project covers a media production floor adding power-intensive IP cameras and Wi-Fi devices. The central concern is to prevent aggregate PoE exhaustion when all ports draw simultaneously. Which HPE Aruba Networking design approach MOST directly addresses the requirement?

  1. Use additional telecom-room placement based on cable pathway reach
  2. Use redundant access service zones with independent power paths where required
  3. Use power-budget calculation across camera and AP ports
  4. Use environmentally suitable mounting and surge-protection design

Explanation

Correct Answer

C:

The architecture works because the sum of endpoint demands and reserve must fit switch PoE capacity, not just individual port maxima; this is a direct response to the need to prevent aggregate PoE exhaustion when all ports draw simultaneously; the design must still check per-device power class and switch supply budget by chassis before selecting exact hardware or policy settings.

Incorrect Answers

A:

The suggested method is appropriate when a customer must keep horizontal copper runs within structured cabling design limits, because copper Ethernet reach is bounded by channel standards and installation quality; for technology selection, the immediate technical objective is to prevent aggregate PoE exhaustion when all ports draw simultaneously, and the needed approach is power-budget calculation across camera and AP ports, not additional telecom-room placement based on cable pathway reach, because the customer requires prevent aggregate PoE exhaustion when all ports draw simultaneously.

B:

The suggested method is appropriate when a customer must remove routine maintenance as a single-point outage for critical ports, because redundancy only helps if endpoints and upstream resources avoid shared failure points; for technology selection, the immediate technical objective is to prevent aggregate PoE exhaustion when all ports draw simultaneously, and the needed approach is power-budget calculation across camera and AP ports, not redundant access service zones with independent power paths where required, because the customer requires prevent aggregate PoE exhaustion when all ports draw simultaneously.

D:

The suggested method is appropriate when a customer must reduce equipment damage and safety risk from surges, because outdoor AP cable routes can introduce electrical exposure not present indoors; for technology selection, the immediate technical objective is to prevent aggregate PoE exhaustion when all ports draw simultaneously, and the needed approach is power-budget calculation across camera and AP ports, not environmentally suitable mounting and surge-protection design, because the customer requires prevent aggregate PoE exhaustion when all ports draw simultaneously.