HP HPE7-A11 (HPE Network Campus Access Professional Architect) Practice Test 17

Question 160

The current project covers a regional enterprise moving manual switch configuration into centralized operations. The central concern is to maintain consistent policies across many buildings without site-by-site scripts. Which current-environment evidence should be collected FIRST to avoid basing the design on an unverified condition?

  1. Collect and analyze automation API integration requirements and change-approval process
  2. Collect and analyze switch software compatibility and current change drift records
  3. Collect and analyze client-event history, WLAN authentication results and path observations
  4. Collect and analyze service transaction baselines from representative locations

Explanation

Correct Answer

B:

The target is to maintain consistent policies across many buildings without site-by-site scripts, so this is the direct baseline for sizing and evaluating the design. Central templates and groups help distribute consistent network configuration while retaining managed scope Without these observations, the team cannot distinguish an actual capacity or compatibility limit from an assumption.

Incorrect Answers

A:

Those observations could inform a different requirement to avoid unmanaged manual edits while retaining rollback control, yet they do not measure the condition that makes maintain consistent policies across many buildings without site-by-site scripts difficult; for current-state inventory analysis, this survey must first establish switch software compatibility and current change drift records, and collecting automation API integration requirements and change-approval process does not establish the requested baseline: switch software compatibility and current change drift records.

C:

Those observations could inform a different requirement to shorten time to localize wireless access incidents, yet they do not measure the condition that makes maintain consistent policies across many buildings without site-by-site scripts difficult; for current-state inventory analysis, this survey must first establish switch software compatibility and current change drift records, and collecting client-event history, WLAN authentication results and path observations does not establish the requested baseline: switch software compatibility and current change drift records.

D:

Those observations could inform a different requirement to detect user experience failures before help-desk tickets accumulate, yet they do not measure the condition that makes maintain consistent policies across many buildings without site-by-site scripts difficult; for current-state inventory analysis, this survey must first establish switch software compatibility and current change drift records, and collecting service transaction baselines from representative locations does not establish the requested baseline: switch software compatibility and current change drift records.

Question 161

Consider a hospital replacing its NAC platform while preserving wired access to clinical devices. The customer asks the architect to prevent mass authentication failures from a simultaneous policy cutover. Which implementation or migration guideline most directly reduces the specified cutover risk?

  1. Plan to redirect a laboratory switch to the new AAA service before moving wards
  2. Plan to pilot one WLAN domain after exporting current configuration baselines
  3. Plan to convert one low-risk VLAN after testing mapped role policies
  4. Plan to upgrade and validate power at one closet before installing all new APs

Explanation

Correct Answer

A:

This stage limits exposure while the critical design premise is being checked: the old RADIUS system includes undocumented vendor-specific attributes. The recommended technical approach is parallel NAC policy validation and phased AAA server changes; verify successful and failed auth logs plus access policy results at the planned gate before extending change scope.

Incorrect Answers

B:

That rollout order reduces risks when the project must retain campus service identity while removing configuration drift, not the known transition hazard in this location; for migration sequence design, this cutover must instead plan to redirect a laboratory switch to the new AAA service before moving wards, and the controlled action for this cutover is to redirect a laboratory switch to the new AAA service before moving wards; the unrelated pilot one WLAN domain after exporting current configuration baselines step does not reduce its dependency risk.

C:

That rollout order reduces risks when the project must preserve permitted application flows during segmentation transition, not the known transition hazard in this location; for migration sequence design, this cutover must instead plan to redirect a laboratory switch to the new AAA service before moving wards, and the controlled action for this cutover is to redirect a laboratory switch to the new AAA service before moving wards; the unrelated convert one low-risk VLAN after testing mapped role policies step does not reduce its dependency risk.

D:

That rollout order reduces risks when the project must avoid discovering electrical shortfalls after installation, not the known transition hazard in this location; for migration sequence design, this cutover must instead plan to redirect a laboratory switch to the new AAA service before moving wards, and the controlled action for this cutover is to redirect a laboratory switch to the new AAA service before moving wards; the unrelated upgrade and validate power at one closet before installing all new APs step does not reduce its dependency risk.

Question 162

An HPE Aruba Networking architecture review concerns a campus using multiple SSIDs for departments that share identical authentication and policy. The customer must reduce management overhead without collapsing needed security distinctions. Which sequence best represents the functional workflow that the architect should diagram?

  1. Document gateway client loads, current failover behavior and software compatibility → design redundant gateway cluster sized for survivable load → verify live failover with application reachability intact
  2. Document identity directory attributes and onboarding journey observation → design ClearPass-assisted wireless onboarding with identity-based roles → verify successful enrollment plus denied unauthorized access in test cases
  3. Document DSCP mapping captures and packet delay and jitter baselines → design end-to-end QoS and WMM mapping with appropriate DSCP trust → verify measured jitter and packet loss with competing bulk traffic
  4. Document SSID-to-role mapping and policy equivalence audit → design role-based access on a reduced set of enterprise SSIDs → verify per-role access tests and SSID airtime overhead comparison

Explanation

Correct Answer

D:

The workflow starts with SSID-to-role mapping and policy equivalence audit, applies the needed service mechanism, and ends with per-role access tests and SSID airtime overhead comparison. Specifically, authorization roles distinguish users without requiring one SSID for every department, and this order avoids treating deployment as proof of success.

Incorrect Answers

A:

Those stages model the dependency chain for allow maintenance without interrupting production tunneled WLANs, not the service path in the present design; for functional workflow mapping, the required stages must address role-based access on a reduced set of enterprise SSIDs, and the appropriate chain is SSID-to-role mapping and policy equivalence audit through role-based access on a reduced set of enterprise SSIDs to per-role access tests and SSID airtime overhead comparison, rather than the unrelated redundant gateway cluster sized for survivable load path.

B:

Those stages model the dependency chain for authenticate eligible residents and confine unregistered devices, not the service path in the present design; for functional workflow mapping, the required stages must address role-based access on a reduced set of enterprise SSIDs, and the appropriate chain is SSID-to-role mapping and policy equivalence audit through role-based access on a reduced set of enterprise SSIDs to per-role access tests and SSID airtime overhead comparison, rather than the unrelated ClearPass-assisted wireless onboarding with identity-based roles path.

C:

Those stages model the dependency chain for preserve voice and video performance during wireless contention, not the service path in the present design; for functional workflow mapping, the required stages must address role-based access on a reduced set of enterprise SSIDs, and the appropriate chain is SSID-to-role mapping and policy equivalence audit through role-based access on a reduced set of enterprise SSIDs to per-role access tests and SSID airtime overhead comparison, rather than the unrelated end-to-end QoS and WMM mapping with appropriate DSCP trust path.

Question 163

A solution architect is assessing a fitness venue with an outdoor courtyard used for ticketed events, with a requirement to support seasonal crowd surges without overbuilding indoor coverage. Which HPE Aruba Networking design approach MOST directly addresses the requirement?

  1. Use a predictive RF model followed by an onsite validation survey
  2. Use selective 2.4 GHz radio enablement with a 5 GHz-first coverage plan
  3. Use an event-focused outdoor RF capacity design separated from indoor cell planning
  4. Use discreet AP placement informed by a physical survey and architectural review

Explanation

Correct Answer

C:

The architecture works because outdoor event concurrency and environmental attenuation differ from indoor office use; this is a direct response to the need to support seasonal crowd surges without overbuilding indoor coverage; the design must still check event attendance profiles and courtyard RF interference survey before selecting exact hardware or policy settings.

Incorrect Answers

A:

The suggested method is appropriate when a customer must restore dependable 5 GHz service behind acoustic partitions, because building materials alter path loss and a real survey checks coverage against the design assumptions; for technology selection, the immediate technical objective is to support seasonal crowd surges without overbuilding indoor coverage, and the needed approach is an event-focused outdoor RF capacity design separated from indoor cell planning, not a predictive RF model followed by an onsite validation survey, because the customer requires support seasonal crowd surges without overbuilding indoor coverage.

B:

The suggested method is appropriate when a customer must reduce co-channel contention while keeping required low-band devices connected, because there are few non-overlapping 2.4 GHz channels and excess cells can increase contention; for technology selection, the immediate technical objective is to support seasonal crowd surges without overbuilding indoor coverage, and the needed approach is an event-focused outdoor RF capacity design separated from indoor cell planning, not selective 2.4 GHz radio enablement with a 5 GHz-first coverage plan, because the customer requires support seasonal crowd surges without overbuilding indoor coverage.

D:

The suggested method is appropriate when a customer must provide visitor Wi-Fi while preserving historical interiors, because masonry attenuates signals and heritage restrictions limit conventional ceiling locations; for technology selection, the immediate technical objective is to support seasonal crowd surges without overbuilding indoor coverage, and the needed approach is an event-focused outdoor RF capacity design separated from indoor cell planning, not discreet AP placement informed by a physical survey and architectural review, because the customer requires support seasonal crowd surges without overbuilding indoor coverage.

Question 164

For a campus using multiple SSIDs for departments that share identical authentication and policy, stakeholders have prioritized the need to reduce management overhead without collapsing needed security distinctions. Which preliminary topology or solution component and associated BoM scope are the best match?

  1. Role-based access on a reduced set of enterprise SSIDs; plan identity integration and WLAN policy test effort
  2. Redundant gateway cluster sized for survivable load; plan additional gateway hardware or entitlement and redundant links
  3. ClearPass-assisted wireless onboarding with identity-based roles; plan NAC capacity and portal or certificate enrollment dependencies
  4. End-to-end QoS and WMM mapping with appropriate DSCP trust; plan QoS design and validation services across AP, gateway and switches
  5. AOS-10 AP bridged forwarding with guest access policy; plan correct access-switch VLAN trunks and visitor firewall policy

Explanation

Correct Answer

A:

The technical selection and equipment or service scope belong together: authorization roles distinguish users without requiring one SSID for every department. Including identity integration and WLAN policy test effort ties the topology to a deliverable estimate, while SSID-to-role mapping and policy equivalence audit must still be validated before the final quantities are committed.

Incorrect Answers

B:

The combination addresses a requirement to allow maintenance without interrupting production tunneled WLANs, using the supporting design principle that gateway clustering removes a single device failure point when capacity and traffic paths are planned; for preliminary topology and bill planning, the active topology requires identity integration and WLAN policy test effort, and for this site the enabling scope is identity integration and WLAN policy test effort; the alternate equipment scope for redundant gateway cluster sized for survivable load would misalign the planned topology.

C:

The combination addresses a requirement to authenticate eligible residents and confine unregistered devices, using the supporting design principle that onboarding and AAA decisions let user identity drive authorized access; for preliminary topology and bill planning, the active topology requires identity integration and WLAN policy test effort, and for this site the enabling scope is identity integration and WLAN policy test effort; the alternate equipment scope for ClearPass-assisted wireless onboarding with identity-based roles would misalign the planned topology.

D:

The combination addresses a requirement to preserve voice and video performance during wireless contention, using the supporting design principle that airtime prioritization and wired queue treatment must agree to protect delay-sensitive flows; for preliminary topology and bill planning, the active topology requires identity integration and WLAN policy test effort, and for this site the enabling scope is identity integration and WLAN policy test effort; the alternate equipment scope for end-to-end QoS and WMM mapping with appropriate DSCP trust would misalign the planned topology.

E:

The combination addresses a requirement to avoid central backhaul for visitor internet while enforcing visitor isolation, using the supporting design principle that bridged mode maps WLAN frames to local VLANs at the AP uplink; for preliminary topology and bill planning, the active topology requires identity integration and WLAN policy test effort, and for this site the enabling scope is identity integration and WLAN policy test effort; the alternate equipment scope for AOS-10 AP bridged forwarding with guest access policy would misalign the planned topology.

Question 165

The current project covers an enterprise fabric with high east-west traffic between buildings. The central concern is to avoid hairpinning all campus policy decisions through central gateways. Which THREE statements make this technical proposal verifiable rather than purely aspirational? Choose THREE.

  1. Record an alternate baseline: IP routing adjacencies and equal-cost path distribution
  2. Specify the acceptance check: traffic-path and role-policy tests for high-volume east-west flows
  3. Record the selected design: distributed NetConductor fabric policy enforcement
  4. Substitute the alternate design: EVPN control plane with VXLAN data-plane tunneling
  5. Establish the baseline: measured intra-campus flow paths and policy enforcement needs
  6. Use the alternate acceptance check: per-VRF allowed routes and denied cross-zone traffic

Explanation

Correct Answers

B:

This proves whether the implementation achieves east-west flows use direct authorized fabric paths at required throughput. A technical proposal without the check of traffic-path and role-policy tests for high-volume east-west flows cannot support a dependable acceptance gate.

C:

The selected architecture is necessary to explain why the requirement can be met. The technical basis is that VTEPs can forward through an overlay while applying identity-based policy without a compulsory central data-plane detour; that mechanism should appear in design documents.

E:

This supplies the observed starting conditions for sizing or policy decisions. It reduces the uncertainty that cross-campus role propagation with third-party devices is unvalidated and sets up a fair before-and-after comparison.

Incorrect Answers

A:

Those observations could inform a different requirement to maintain connectivity after an underlay link fails without blocked standby trunks, yet they do not measure the condition that makes avoid hairpinning all campus policy decisions through central gateways difficult; for technical proposal drafting, this survey must first establish measured intra-campus flow paths and policy enforcement needs, and collecting IP routing adjacencies and equal-cost path distribution does not establish the requested baseline: measured intra-campus flow paths and policy enforcement needs.

D:

The suggested method is appropriate when a customer must distribute segment membership without stretching physical access VLANs everywhere, because EVPN advertises endpoint information while VXLAN carries traffic between tunnel endpoints; for technical proposal drafting, the immediate technical objective is to avoid hairpinning all campus policy decisions through central gateways, and the needed approach is distributed NetConductor fabric policy enforcement, not EVPN control plane with VXLAN data-plane tunneling, because the customer requires avoid hairpinning all campus policy decisions through central gateways.

F:

This checks an outcome of another project that aims to preserve segment isolation at a supported external boundary, but it would not demonstrate compliance with the current service target; for technical proposal drafting, the actual contract targets east-west flows use direct authorized fabric paths at required throughput, and acceptance must use traffic-path and role-policy tests for high-volume east-west flows and east-west flows use direct authorized fabric paths at required throughput; the per-VRF allowed routes and denied cross-zone traffic test is not evidence for that contractual outcome.

Question 166

The current project covers an urban campus introducing higher-power APs while retaining older access closets. The central concern is to avoid discovering electrical shortfalls after installation. Which statement best translates the request into a technical acceptance requirement?

  1. Accept only when all planned AP features run with safe reserve at peak load
  2. Accept only when every tenant route is isolated or intentionally translated
  3. Accept only when one building transitions at a time without a campus-wide outage
  4. Accept only when the tunneled design supports peak sessions without violating approved paths

Explanation

Correct Answer

A:

This turns the qualitative request into a condition that can be checked using AP power negotiation and closet draw under simulated peak. It directly tests the requirement to avoid discovering electrical shortfalls after installation, while allowing the architect to identify the evidence needed at the service boundary.

Incorrect Answers

B:

That success condition concerns a different requirement to avoid overlapping routing domains becoming accidentally interconnected, rather than the customer outcome at issue in an urban campus introducing higher-power APs while retaining older access closets; for requirements interpretation, the current acceptance test is AP power negotiation and closet draw under simulated peak, and passing route uniqueness and intended tenant access checks would not prove the required result: all planned AP features run with safe reserve at peak load.

C:

That success condition concerns a different requirement to avoid a flag-day replacement of all access uplinks, rather than the customer outcome at issue in an urban campus introducing higher-power APs while retaining older access closets; for requirements interpretation, the current acceptance test is AP power negotiation and closet draw under simulated peak, and passing single-path failure tests at each phase would not prove the required result: all planned AP features run with safe reserve at peak load.

D:

That success condition concerns a different requirement to avoid unexpected traffic detours and firewall bottlenecks, rather than the customer outcome at issue in an urban campus introducing higher-power APs while retaining older access closets; for requirements interpretation, the current acceptance test is AP power negotiation and closet draw under simulated peak, and passing packet traces, application latency and roaming after migration would not prove the required result: all planned AP features run with safe reserve at peak load.

Question 167

A solution architect is assessing a museum with thick masonry walls and strict restrictions on visible hardware, with a requirement to provide visitor Wi-Fi while preserving historical interiors. Which review evidence should determine whether the design can be technically and commercially accepted?

  1. Obtain co-channel interference and client goodput during full seating
  2. Obtain scanner transaction continuity while moving past full shelving
  3. Obtain visitor connectivity and visual acceptance in representative galleries
  4. Obtain payment-terminal sessions tested across the structure

Explanation

Correct Answer

C:

The technical review needs visitor connectivity and visual acceptance in representative galleries to demonstrate the service outcome, not merely equipment presence. Using visitor connectivity and visual acceptance in representative galleries against approved visitor coverage without violating conservation constraints shows whether discreet AP placement informed by a physical survey and architectural review satisfies the customer; the business reviewer can then release acceptance and payment milestones.

Incorrect Answers

A:

This checks an outcome of another project that aims to increase usable spectral efficiency without assuming wider channels always help, but it would not demonstrate compliance with the current service target; for technical acceptance review, the actual contract targets approved visitor coverage without violating conservation constraints, and acceptance must use visitor connectivity and visual acceptance in representative galleries and approved visitor coverage without violating conservation constraints; the co-channel interference and client goodput during full seating test is not evidence for that contractual outcome.

B:

This checks an outcome of another project that aims to maintain scanner connectivity down narrow aisles despite metal reflection, but it would not demonstrate compliance with the current service target; for technical acceptance review, the actual contract targets approved visitor coverage without violating conservation constraints, and acceptance must use visitor connectivity and visual acceptance in representative galleries and approved visitor coverage without violating conservation constraints; the scanner transaction continuity while moving past full shelving test is not evidence for that contractual outcome.

D:

This checks an outcome of another project that aims to cover exposed ramps despite weather and variable vehicle obstruction, but it would not demonstrate compliance with the current service target; for technical acceptance review, the actual contract targets approved visitor coverage without violating conservation constraints, and acceptance must use visitor connectivity and visual acceptance in representative galleries and approved visitor coverage without violating conservation constraints; the payment-terminal sessions tested across the structure test is not evidence for that contractual outcome.

Question 168

For an insurer integrating centrally managed Aruba APs with a legacy monitoring platform, stakeholders have prioritized the need to maintain observable service during coexistence of management tools. Which alternative should the architect advance in the proposal meeting, with an explicit trade-off?

  1. Advance dual-vendor interface and routing compatibility plan to deliver lower migration risk when changing security vendors, subject to resolving the issue that the replacement firewall may not support the same route-policy semantics
  2. Advance cell-by-cell migration with parallel connectivity where feasible to deliver higher manufacturing uptime through controlled change, subject to resolving the issue that one legacy controller may require an undocumented broadcast service
  3. Advance coexistence monitoring map and phased tool migration to deliver seamless operational transition with fewer monitoring blind spots, subject to resolving the issue that some legacy pollers cannot interpret new device telemetry
  4. Advance joint clinical validation and controlled coexistence testing to deliver reliable infrastructure without compromising clinical safety, subject to resolving the issue that vendor recertification may be required for a radio change

Explanation

Correct Answer

C:

This proposal binds an implemented mechanism to the customer’s outcome: management migration should preserve alert coverage before old systems are retired. Stating the unresolved condition makes the cost and risk comparison credible, while matching fault detection and notification during simulated device loss provides a future acceptance check.

Incorrect Answers

A:

This competing proposal is designed for keep control of route exchange and security zones during handover, where handoff design must reconcile route tables, interface tagging and enforcement behavior; for customer proposal comparison, the present proposal must produce seamless operational transition with fewer monitoring blind spots, and this selection must address seamless operational transition with fewer monitoring blind spots with coexistence monitoring map and phased tool migration, rather than substituting the scope of dual-vendor interface and routing compatibility plan.

B:

This competing proposal is designed for avoid production downtime during maintenance constrained to short shifts, where small migration domains limit incident blast radius and enable rapid reversal; for customer proposal comparison, the present proposal must produce seamless operational transition with fewer monitoring blind spots, and this selection must address seamless operational transition with fewer monitoring blind spots with coexistence monitoring map and phased tool migration, rather than substituting the scope of cell-by-cell migration with parallel connectivity where feasible.

D:

This competing proposal is designed for introduce connectivity without affecting certified clinical systems, where clinical device interoperability requires evidence beyond generic wireless throughput; for customer proposal comparison, the present proposal must produce seamless operational transition with fewer monitoring blind spots, and this selection must address seamless operational transition with fewer monitoring blind spots with coexistence monitoring map and phased tool migration, rather than substituting the scope of joint clinical validation and controlled coexistence testing.

Question 169

An HPE Aruba Networking architecture review concerns a university with inconsistent firmware versions across network access buildings. The customer must reduce unreviewed feature differences and upgrade risk. Which review evidence should determine whether the design can be technically and commercially accepted?

  1. Obtain event ordering across AP, switch, ClearPass and firewall records
  2. Obtain time to root cause and accuracy of incident prioritization
  3. Obtain change-log traceability and rollback after a deliberate API error
  4. Obtain feature regression and version-compliance verification

Explanation

Correct Answer

D:

The technical review needs feature regression and version-compliance verification to demonstrate the service outcome, not merely equipment presence. Using feature regression and version-compliance verification against approved releases deployed in supported groups with documented exceptions shows whether Central-assisted firmware governance and staged upgrade planning satisfies the customer; the business reviewer can then release acceptance and payment milestones.

Incorrect Answers

A:

This checks an outcome of another project that aims to retain time-correlated evidence across WLAN, NAC and switch components, but it would not demonstrate compliance with the current service target; for technical acceptance review, the actual contract targets approved releases deployed in supported groups with documented exceptions, and acceptance must use feature regression and version-compliance verification and approved releases deployed in supported groups with documented exceptions; the event ordering across AP, switch, ClearPass and firewall records test is not evidence for that contractual outcome.

B:

This checks an outcome of another project that aims to correlate incident evidence and prioritize customer-impacting faults, but it would not demonstrate compliance with the current service target; for technical acceptance review, the actual contract targets approved releases deployed in supported groups with documented exceptions, and acceptance must use feature regression and version-compliance verification and approved releases deployed in supported groups with documented exceptions; the time to root cause and accuracy of incident prioritization test is not evidence for that contractual outcome.

C:

This checks an outcome of another project that aims to avoid unmanaged manual edits while retaining rollback control, but it would not demonstrate compliance with the current service target; for technical acceptance review, the actual contract targets approved releases deployed in supported groups with documented exceptions, and acceptance must use feature regression and version-compliance verification and approved releases deployed in supported groups with documented exceptions; the change-log traceability and rollback after a deliberate API error test is not evidence for that contractual outcome.

Question 170

A solution architect is assessing a parking structure requiring dependable outdoor payment-terminal connectivity, with a requirement to cover exposed ramps despite weather and variable vehicle obstruction. Which current-environment evidence should be collected FIRST to avoid basing the design on an unverified condition?

  1. Collect and analyze peak concurrency counts and measured airtime utilization during an event
  2. Collect and analyze client capability inventory by frequency band and software level
  3. Collect and analyze outdoor signal measurements and terminal antenna specifications
  4. Collect and analyze aisle-level signal surveys and scanner radio capabilities

Explanation

Correct Answer

C:

The target is to cover exposed ramps despite weather and variable vehicle obstruction, so this is the direct baseline for sizing and evaluating the design. Propagation, enclosure protection and mounting safety differ from normal indoor installations Without these observations, the team cannot distinguish an actual capacity or compatibility limit from an assumption.

Incorrect Answers

A:

Those observations could inform a different requirement to deliver capacity for simultaneous video-streaming attendees rather than merely strong signal, yet they do not measure the condition that makes cover exposed ramps despite weather and variable vehicle obstruction difficult; for current-state inventory analysis, this survey must first establish outdoor signal measurements and terminal antenna specifications, and collecting peak concurrency counts and measured airtime utilization during an event does not establish the requested baseline: outdoor signal measurements and terminal antenna specifications.

B:

Those observations could inform a different requirement to add higher-capacity spectrum without disconnecting legacy Wi-Fi clients, yet they do not measure the condition that makes cover exposed ramps despite weather and variable vehicle obstruction difficult; for current-state inventory analysis, this survey must first establish outdoor signal measurements and terminal antenna specifications, and collecting client capability inventory by frequency band and software level does not establish the requested baseline: outdoor signal measurements and terminal antenna specifications.

D:

Those observations could inform a different requirement to maintain scanner connectivity down narrow aisles despite metal reflection, yet they do not measure the condition that makes cover exposed ramps despite weather and variable vehicle obstruction difficult; for current-state inventory analysis, this survey must first establish outdoor signal measurements and terminal antenna specifications, and collecting aisle-level signal surveys and scanner radio capabilities does not establish the requested baseline: outdoor signal measurements and terminal antenna specifications.