During a campus access design for an industrial workshop whose network closet experiences airborne dust and heat, the team must choose networking equipment supportable within environmental limits. Which statement best translates the request into a technical acceptance requirement?

  1. Accept only when sustained wired backhaul above the modeled wireless aggregate peak
  2. Accept only when sufficient serviceable ports with agreed growth reserve
  3. Accept only when all installed equipment operates within documented environmental ranges
  4. Accept only when installation passes the approved electrical and grounding inspection
  5. Accept only when the defined critical-port service survives the target outage duration

Explanation

Correct Answer

C:

This turns the qualitative request into a condition that can be checked using sustained temperature and equipment-health monitoring. It directly tests the requirement to choose networking equipment supportable within environmental limits, while allowing the architect to identify the evidence needed at the service boundary.

Incorrect Answers

A:

That success condition concerns a different requirement to prevent a 1 GbE access link from constraining high-capacity AP traffic, rather than the customer outcome at issue in an industrial workshop whose network closet experiences airborne dust and heat; for requirements interpretation, the current acceptance test is sustained temperature and equipment-health monitoring, and passing wired port speed and end-to-end load measurements would not prove the required result: all installed equipment operates within documented environmental ranges.

B:

That success condition concerns a different requirement to avoid overlooking patch-panel and physical port capacity, rather than the customer outcome at issue in an industrial workshop whose network closet experiences airborne dust and heat; for requirements interpretation, the current acceptance test is sustained temperature and equipment-health monitoring, and passing every planned outlet has a reachable labeled switch port would not prove the required result: all installed equipment operates within documented environmental ranges.

D:

That success condition concerns a different requirement to reduce equipment damage and safety risk from surges, rather than the customer outcome at issue in an industrial workshop whose network closet experiences airborne dust and heat; for requirements interpretation, the current acceptance test is sustained temperature and equipment-health monitoring, and passing ground-bond verification and acceptance inspection would not prove the required result: all installed equipment operates within documented environmental ranges.

E:

That success condition concerns a different requirement to maintain campus access during short facility power outages, rather than the customer outcome at issue in an industrial workshop whose network closet experiences airborne dust and heat; for requirements interpretation, the current acceptance test is sustained temperature and equipment-health monitoring, and passing critical AP and voice-port continuity during simulated loss of mains would not prove the required result: all installed equipment operates within documented environmental ranges.

Question 321

For a university migrating from local switch credentials to centrally managed administrators, stakeholders have prioritized the need to control privileged switch actions with accountable identities. Which HPE Aruba Networking design approach MOST directly addresses the requirement?

  1. Use ClearPass Guest or appropriately scoped visitor onboarding
  2. Use centralized role-based policy with ClearPass and compatible enforcement points
  3. Use ClearPass TACACS+ device-administration policy
  4. Use ClearPass dynamic authorization and restricted user roles
  5. Use MAC authentication paired with restrictive ClearPass roles

Explanation

Correct Answer

C:

The architecture works because central AAA for device administration can distinguish operator permissions from endpoint network access; this is a direct response to the need to control privileged switch actions with accountable identities; the design must still check admin-login inventory and current TACACS+ integration capability before selecting exact hardware or policy settings.

Incorrect Answers

A:

The suggested method is appropriate when a customer must issue expiring guest access without maintaining permanent identities, because time-bounded guest identity and policy can separate visitors from managed users; for technology selection, the immediate technical objective is to control privileged switch actions with accountable identities, and the needed approach is ClearPass TACACS+ device-administration policy, not ClearPass Guest or appropriately scoped visitor onboarding, because the customer requires control privileged switch actions with accountable identities.

B:

The suggested method is appropriate when a customer must apply consistent least-privilege policy regardless of connection medium, because policy can follow authenticated identity rather than a fixed switch port or SSID; for technology selection, the immediate technical objective is to control privileged switch actions with accountable identities, and the needed approach is ClearPass TACACS+ device-administration policy, not centralized role-based policy with ClearPass and compatible enforcement points, because the customer requires control privileged switch actions with accountable identities.

D:

The suggested method is appropriate when a customer must change client privileges without waiting for manual switch-port changes, because RADIUS CoA or session reauthorization can update an active endpoint's assigned access; for technology selection, the immediate technical objective is to control privileged switch actions with accountable identities, and the needed approach is ClearPass TACACS+ device-administration policy, not ClearPass dynamic authorization and restricted user roles, because the customer requires control privileged switch actions with accountable identities.

E:

The suggested method is appropriate when a customer must admit known OT assets without granting broad campus access, because MAB can identify non-802.1X endpoints but requires compensating authorization policy; for technology selection, the immediate technical objective is to control privileged switch actions with accountable identities, and the needed approach is ClearPass TACACS+ device-administration policy, not MAC authentication paired with restrictive ClearPass roles, because the customer requires control privileged switch actions with accountable identities.

Question 322

During a campus access design for a branch campus currently using a single gateway that cannot meet its maintenance SLA, the team must allow maintenance without interrupting production tunneled WLANs. Which implementation or migration guideline most directly reduces the specified cutover risk?

  1. Plan to conduct a planned WAN-isolation pilot before adoption
  2. Plan to onboard a small clinical device cohort and audit assigned roles
  3. Plan to establish cluster and verify synchronization before moving clients
  4. Plan to introduce gateway clusters and migrate one corporate SSID at a time

Explanation

Correct Answer

C:

This stage limits exposure while the critical design premise is being checked: surviving gateway capacity under peak load has not been measured. The recommended technical approach is redundant gateway cluster sized for survivable load; verify live failover with application reachability intact at the planned gate before extending change scope.

Incorrect Answers

A:

That rollout order reduces risks when the project must preserve local client connectivity while management connectivity fluctuates, not the known transition hazard in this location; for migration sequence design, this cutover must instead plan to establish cluster and verify synchronization before moving clients, and the controlled action for this cutover is to establish cluster and verify synchronization before moving clients; the unrelated conduct a planned WAN-isolation pilot before adoption step does not reduce its dependency risk.

B:

That rollout order reduces risks when the project must provide controlled connectivity to known devices while excluding unknown MACs, not the known transition hazard in this location; for migration sequence design, this cutover must instead plan to establish cluster and verify synchronization before moving clients, and the controlled action for this cutover is to establish cluster and verify synchronization before moving clients; the unrelated onboard a small clinical device cohort and audit assigned roles step does not reduce its dependency risk.

D:

That rollout order reduces risks when the project must maintain a consistent roaming domain with centralized policy inspection, not the known transition hazard in this location; for migration sequence design, this cutover must instead plan to establish cluster and verify synchronization before moving clients, and the controlled action for this cutover is to establish cluster and verify synchronization before moving clients; the unrelated introduce gateway clusters and migrate one corporate SSID at a time step does not reduce its dependency risk.

Question 323

An HPE Aruba Networking architecture review concerns a manufacturer moving plant-floor segmentation to new switches. The customer must avoid production downtime during maintenance constrained to short shifts. Which HPE Aruba Networking design approach MOST directly addresses the requirement?

  1. Use explicit failover and recovery runbooks coupled with monitoring
  2. Use cell-by-cell migration with parallel connectivity where feasible
  3. Use coexistence monitoring map and phased tool migration
  4. Use dual-vendor interface and routing compatibility plan

Explanation

Correct Answer

B:

The architecture works because small migration domains limit incident blast radius and enable rapid reversal; this is a direct response to the need to avoid production downtime during maintenance constrained to short shifts; the design must still check production-line dependency map and maintenance window lengths before selecting exact hardware or policy settings.

Incorrect Answers

A:

The suggested method is appropriate when a customer must assure network operations can distinguish local device loss from upstream failure, because declared failure domains and recovery steps make availability testable during change; for technology selection, the immediate technical objective is to avoid production downtime during maintenance constrained to short shifts, and the needed approach is cell-by-cell migration with parallel connectivity where feasible, not explicit failover and recovery runbooks coupled with monitoring, because the customer requires avoid production downtime during maintenance constrained to short shifts.

C:

The suggested method is appropriate when a customer must maintain observable service during coexistence of management tools, because management migration should preserve alert coverage before old systems are retired; for technology selection, the immediate technical objective is to avoid production downtime during maintenance constrained to short shifts, and the needed approach is cell-by-cell migration with parallel connectivity where feasible, not coexistence monitoring map and phased tool migration, because the customer requires avoid production downtime during maintenance constrained to short shifts.

D:

The suggested method is appropriate when a customer must keep control of route exchange and security zones during handover, because handoff design must reconcile route tables, interface tagging and enforcement behavior; for technology selection, the immediate technical objective is to avoid production downtime during maintenance constrained to short shifts, and the needed approach is cell-by-cell migration with parallel connectivity where feasible, not dual-vendor interface and routing compatibility plan, because the customer requires avoid production downtime during maintenance constrained to short shifts.

Question 324

The current project covers a technology company where employees need role-specific access to shared printers on the same IP segment. The central concern is to enforce application-level distinctions that VLAN membership alone cannot express. Which executive-brief message most clearly connects this architecture investment to the business need?

  1. The project aims for reduced exposure between protected and public traffic, proven by routing-table and firewall-flow verification for each domain
  2. The project aims for faster containment of security incidents, proven by time-to-quarantine and proof that remediation services remain reachable
  3. The project aims for consistent contractor access with fewer policy exceptions, proven by role-policy parity tests for wired and wireless users
  4. The project aims for less lateral access without proliferating VLANs, proven by role-based allow and deny checks while users share the VLAN

Explanation

Correct Answer

D:

Sponsors are buying a measurable outcome, not only a device feature. The promised benefit is less lateral access without proliferating VLANs, and the acceptance evidence is role-based allow and deny checks while users share the VLAN; the proposal should also disclose that existing switches may not support the required fabric role propagation before presenting a firm schedule or price.

Incorrect Answers

A:

The benefit belongs to a different initiative focused on prevent accidental routing between independent security domains, so it is not evidence for the requested investment; for executive outcome briefing, this board decision is about less lateral access without proliferating VLANs, and in this proposal the investment must support less lateral access without proliferating VLANs, rather than the return described for dedicated VRFs with explicitly mediated firewall connectivity.

B:

The benefit belongs to a different initiative focused on change client privileges without waiting for manual switch-port changes, so it is not evidence for the requested investment; for executive outcome briefing, this board decision is about less lateral access without proliferating VLANs, and in this proposal the investment must support less lateral access without proliferating VLANs, rather than the return described for ClearPass dynamic authorization and restricted user roles.

C:

The benefit belongs to a different initiative focused on apply consistent least-privilege policy regardless of connection medium, so it is not evidence for the requested investment; for executive outcome briefing, this board decision is about less lateral access without proliferating VLANs, and in this proposal the investment must support less lateral access without proliferating VLANs, rather than the return described for centralized role-based policy with ClearPass and compatible enforcement points.

Question 325

A solution architect is assessing a research institute requiring absolute separation between classified lab routes and public guest access, with a requirement to prevent accidental routing between independent security domains. Which sequence best represents the functional workflow that the architect should diagram?

  1. Document device ownership classification and target internet or patient-app flows → design identity and device-based role enforcement through ClearPass → verify packet-level proof of isolation from clinical endpoints
  2. Document current VRF, VLAN and firewall interface inventory → design dedicated VRFs with explicitly mediated firewall connectivity → verify routing-table and firewall-flow verification for each domain
  3. Document controller MAC inventory and permitted control-system communications → design MAC authentication paired with restrictive ClearPass roles → verify allowed control traffic and denied unapproved east-west flows
  4. Document DHCP, MAC and endpoint fingerprint coverage → design device profiling with a restrictive initial authorization role → verify role change and denied access during the unprofiled state

Explanation

Correct Answer

B:

The workflow starts with current VRF, VLAN and firewall interface inventory, applies the needed service mechanism, and ends with routing-table and firewall-flow verification for each domain. Specifically, independent forwarding tables provide macrosegmentation beyond merely tagging endpoints, and this order avoids treating deployment as proof of success.

Incorrect Answers

A:

Those stages model the dependency chain for minimize lateral movement from unmanaged personal endpoints, not the service path in the present design; for functional workflow mapping, the required stages must address dedicated VRFs with explicitly mediated firewall connectivity, and the appropriate chain is current VRF, VLAN and firewall interface inventory through dedicated VRFs with explicitly mediated firewall connectivity to routing-table and firewall-flow verification for each domain, rather than the unrelated identity and device-based role enforcement through ClearPass path.

C:

Those stages model the dependency chain for admit known OT assets without granting broad campus access, not the service path in the present design; for functional workflow mapping, the required stages must address dedicated VRFs with explicitly mediated firewall connectivity, and the appropriate chain is current VRF, VLAN and firewall interface inventory through dedicated VRFs with explicitly mediated firewall connectivity to routing-table and firewall-flow verification for each domain, rather than the unrelated MAC authentication paired with restrictive ClearPass roles path.

D:

Those stages model the dependency chain for restrict unknown asset types until profiling evidence becomes available, not the service path in the present design; for functional workflow mapping, the required stages must address dedicated VRFs with explicitly mediated firewall connectivity, and the appropriate chain is current VRF, VLAN and firewall interface inventory through dedicated VRFs with explicitly mediated firewall connectivity to routing-table and firewall-flow verification for each domain, rather than the unrelated device profiling with a restrictive initial authorization role path.

Question 326

An HPE Aruba Networking architecture review concerns a mixed-use campus whose employee SSID needs local traffic for printers but tunneled traffic for restricted research. The customer must select forwarding per user policy without multiplying SSIDs. Which current-environment evidence should be collected FIRST to avoid basing the design on an unverified condition?

  1. Collect and analyze SSID-to-role mapping and policy equivalence audit
  2. Collect and analyze policy inventory of local versus inspected application flows
  3. Collect and analyze gateway client loads, current failover behavior and software compatibility
  4. Collect and analyze current IP roaming behavior and gateway mobility capacity

Explanation

Correct Answer

B:

The target is to select forwarding per user policy without multiplying SSIDs, so this is the direct baseline for sizing and evaluating the design. Mixed mode can combine local bridging and gateway tunneling for a wlan according to policy Without these observations, the team cannot distinguish an actual capacity or compatibility limit from an assumption.

Incorrect Answers

A:

Those observations could inform a different requirement to reduce management overhead without collapsing needed security distinctions, yet they do not measure the condition that makes select forwarding per user policy without multiplying SSIDs difficult; for current-state inventory analysis, this survey must first establish policy inventory of local versus inspected application flows, and collecting SSID-to-role mapping and policy equivalence audit does not establish the requested baseline: policy inventory of local versus inspected application flows.

C:

Those observations could inform a different requirement to allow maintenance without interrupting production tunneled WLANs, yet they do not measure the condition that makes select forwarding per user policy without multiplying SSIDs difficult; for current-state inventory analysis, this survey must first establish policy inventory of local versus inspected application flows, and collecting gateway client loads, current failover behavior and software compatibility does not establish the requested baseline: policy inventory of local versus inspected application flows.

D:

Those observations could inform a different requirement to maintain a consistent roaming domain with centralized policy inspection, yet they do not measure the condition that makes select forwarding per user policy without multiplying SSIDs difficult; for current-state inventory analysis, this survey must first establish policy inventory of local versus inspected application flows, and collecting current IP roaming behavior and gateway mobility capacity does not establish the requested baseline: policy inventory of local versus inspected application flows.

Question 327

A customer scenario involves a campus planning several new wiring closets for an expansion wing. The design objective is to keep horizontal copper runs within structured cabling design limits. Which sequence best represents the functional workflow that the architect should diagram?

  1. Document per-AP negotiated power requirements and existing PoE budgets → design switch selection based on per-port PoE standard and aggregate power budget → verify negotiated power and active radios under peak client load
  2. Document fiber type, measured length, connector condition and optic compatibility → design fiber-plant validation and correctly matched transceiver selection → verify error-free link operation and optical power readings on worst-case spans
  3. Document power-failure history, switch draw and available UPS runtime → design UPS and redundant-power planning for network closets → verify critical AP and voice-port continuity during simulated loss of mains
  4. Document walked cable routes, closet positions and actual path lengths → design additional telecom-room placement based on cable pathway reach → verify certified cabling test records for the installed outlets

Explanation

Correct Answer

D:

The workflow starts with walked cable routes, closet positions and actual path lengths, applies the needed service mechanism, and ends with certified cabling test records for the installed outlets. Specifically, copper Ethernet reach is bounded by channel standards and installation quality, and this order avoids treating deployment as proof of success.

Incorrect Answers

A:

Those stages model the dependency chain for avoid under-powering AP radios and uplink functions, not the service path in the present design; for functional workflow mapping, the required stages must address additional telecom-room placement based on cable pathway reach, and the appropriate chain is walked cable routes, closet positions and actual path lengths through additional telecom-room placement based on cable pathway reach to certified cabling test records for the installed outlets, rather than the unrelated switch selection based on per-port PoE standard and aggregate power budget path.

B:

Those stages model the dependency chain for avoid optical reach and transceiver mismatches during a switching refresh, not the service path in the present design; for functional workflow mapping, the required stages must address additional telecom-room placement based on cable pathway reach, and the appropriate chain is walked cable routes, closet positions and actual path lengths through additional telecom-room placement based on cable pathway reach to certified cabling test records for the installed outlets, rather than the unrelated fiber-plant validation and correctly matched transceiver selection path.

C:

Those stages model the dependency chain for maintain campus access during short facility power outages, not the service path in the present design; for functional workflow mapping, the required stages must address additional telecom-room placement based on cable pathway reach, and the appropriate chain is walked cable routes, closet positions and actual path lengths through additional telecom-room placement based on cable pathway reach to certified cabling test records for the installed outlets, rather than the unrelated UPS and redundant-power planning for network closets path.

Question 328

Consider a campus replacing a third-party firewall adjacent to an Aruba fabric. The customer asks the architect to keep control of route exchange and security zones during handover. Which executive-brief message most clearly connects this architecture investment to the business need?

  1. The project aims for lower migration risk when changing security vendors, proven by route advertisements and rule-hit evidence across the boundary
  2. The project aims for greater confidence in scheduled maintenance, proven by service availability and recovery time during maintenance
  3. The project aims for controlled transition cost without support gaps, proven by asset retirement records and handover approvals
  4. The project aims for reliable infrastructure without compromising clinical safety, proven by documented device safety and function sign-off
  5. The project aims for seamless operational transition with fewer monitoring blind spots, proven by matching fault detection and notification during simulated device loss

Explanation

Correct Answer

A:

Sponsors are buying a measurable outcome, not only a device feature. The promised benefit is lower migration risk when changing security vendors, and the acceptance evidence is route advertisements and rule-hit evidence across the boundary; the proposal should also disclose that the replacement firewall may not support the same route-policy semantics before presenting a firm schedule or price.

Incorrect Answers

B:

The benefit belongs to a different initiative focused on assure network operations can distinguish local device loss from upstream failure, so it is not evidence for the requested investment; for executive outcome briefing, this board decision is about lower migration risk when changing security vendors, and in this proposal the investment must support lower migration risk when changing security vendors, rather than the return described for explicit failover and recovery runbooks coupled with monitoring.

C:

The benefit belongs to a different initiative focused on coordinate old and new support without paying indefinitely for duplicate coverage, so it is not evidence for the requested investment; for executive outcome briefing, this board decision is about lower migration risk when changing security vendors, and in this proposal the investment must support lower migration risk when changing security vendors, rather than the return described for asset transition schedule linked to support and acceptance milestones.

D:

The benefit belongs to a different initiative focused on introduce connectivity without affecting certified clinical systems, so it is not evidence for the requested investment; for executive outcome briefing, this board decision is about lower migration risk when changing security vendors, and in this proposal the investment must support lower migration risk when changing security vendors, rather than the return described for joint clinical validation and controlled coexistence testing.

E:

The benefit belongs to a different initiative focused on maintain observable service during coexistence of management tools, so it is not evidence for the requested investment; for executive outcome briefing, this board decision is about lower migration risk when changing security vendors, and in this proposal the investment must support lower migration risk when changing security vendors, rather than the return described for coexistence monitoring map and phased tool migration.

Question 329

An HPE Aruba Networking architecture review concerns a campus retiring its legacy monitoring platform after a network refresh. The customer must avoid losing historical incident visibility at the service desk. Which alternative should the architect advance in the proposal meeting, with an explicit trade-off?

  1. Advance dual-run monitoring transition with documented acceptance gates to deliver continued service visibility during platform consolidation, subject to resolving the issue that some old monitoring integrations have no maintained specification
  2. Advance phased tunnel-mode migration supported by resilient gateways to deliver central policy control without traffic-path surprises, subject to resolving the issue that a line-of-business service may use local discovery broadcasts
  3. Advance staged Central enrollment and configuration migration to deliver simpler operations without a disruptive identity change, subject to resolving the issue that existing WLAN templates may hide site-specific exceptions
  4. Advance power-first migration design and phased closet upgrades to deliver fewer unexpected AP performance downgrades, subject to resolving the issue that some older PoE injectors are undocumented
  5. Advance tenant-by-tenant addressing and VRF migration plan to deliver less disruptive segmentation modernization, subject to resolving the issue that some applications embed literal IP addresses in configuration

Explanation

Correct Answer

A:

This proposal binds an implemented mechanism to the customer’s outcome: operations should prove equivalent fault coverage before decommissioning an established system. Stating the unresolved condition makes the cost and risk comparison credible, while incident detection parity and escalation outcomes provides a future acceptance check.

Incorrect Answers

B:

This competing proposal is designed for avoid unexpected traffic detours and firewall bottlenecks, where centralizing forwarding changes gateway capacity and inspection paths; for customer proposal comparison, the present proposal must produce continued service visibility during platform consolidation, and this selection must address continued service visibility during platform consolidation with dual-run monitoring transition with documented acceptance gates, rather than substituting the scope of phased tunnel-mode migration supported by resilient gateways.

C:

This competing proposal is designed for retain campus service identity while removing configuration drift, where administrative migration must preserve authentication and forwarding behaviors through device transitions; for customer proposal comparison, the present proposal must produce continued service visibility during platform consolidation, and this selection must address continued service visibility during platform consolidation with dual-run monitoring transition with documented acceptance gates, rather than substituting the scope of staged Central enrollment and configuration migration.

D:

This competing proposal is designed for avoid discovering electrical shortfalls after installation, where new AP demands can exceed both per-port and total power envelopes of old switches; for customer proposal comparison, the present proposal must produce continued service visibility during platform consolidation, and this selection must address continued service visibility during platform consolidation with dual-run monitoring transition with documented acceptance gates, rather than substituting the scope of power-first migration design and phased closet upgrades.

E:

This competing proposal is designed for avoid overlapping routing domains becoming accidentally interconnected, where VRF separation can preserve overlapping IPs, but interconnection requires deliberate policy; for customer proposal comparison, the present proposal must produce continued service visibility during platform consolidation, and this selection must address continued service visibility during platform consolidation with dual-run monitoring transition with documented acceptance gates, rather than substituting the scope of tenant-by-tenant addressing and VRF migration plan.

Question 330

A solution architect is assessing a university board requesting a one-page decision on a campus access modernization, with a requirement to summarize business goals without concealing key risks and dependencies. Which executive-brief message most clearly connects this architecture investment to the business need?

  1. The project aims for fewer expensive change orders and better service quality, proven by documented signal and load criteria rather than only AP counts
  2. The project aims for fewer disputes and uncontrolled change orders, proven by customer approval of assumptions and revised counts
  3. The project aims for faster informed approval with fewer late redesigns, proven by signed project objectives and risk ownership assignments
  4. The project aims for stronger audit confidence with less manual evidence gathering, proven by allow and deny logs matched to approved access policies

Explanation

Correct Answer

C:

Sponsors are buying a measurable outcome, not only a device feature. The promised benefit is faster informed approval with fewer late redesigns, and the acceptance evidence is signed project objectives and risk ownership assignments; the proposal should also disclose that several important stakeholder assumptions lack explicit sign-off before presenting a firm schedule or price.

Incorrect Answers

A:

The benefit belongs to a different initiative focused on tie engineering work to demonstrable application outcomes, so it is not evidence for the requested investment; for executive outcome briefing, this board decision is about faster informed approval with fewer late redesigns, and in this proposal the investment must support faster informed approval with fewer late redesigns, rather than the return described for validated predictive and post-installation RF survey program.

B:

The benefit belongs to a different initiative focused on separate binding prices from unverified demand assumptions, so it is not evidence for the requested investment; for executive outcome briefing, this board decision is about faster informed approval with fewer late redesigns, and in this proposal the investment must support faster informed approval with fewer late redesigns, rather than the return described for a conditional BoM with quantified assumptions and change control.

D:

The benefit belongs to a different initiative focused on map design controls to independently reviewable outcomes, so it is not evidence for the requested investment; for executive outcome briefing, this board decision is about faster informed approval with fewer late redesigns, and in this proposal the investment must support faster informed approval with fewer late redesigns, rather than the return described for access-control design with an explicit policy-to-evidence traceability matrix.