Question 700
For a regional enterprise moving manual switch configuration into centralized operations, stakeholders have prioritized the need to maintain consistent policies across many buildings without site-by-site scripts. Which statement best translates the request into a technical acceptance requirement?
- Accept only when tickets identify association, authentication or IP service cause within target time
- Accept only when repeatable configuration updates with traceable outcomes
- Accept only when common approved settings reach in-scope devices with tracked exceptions
- Accept only when synthetic tests detect DNS and application-access failures within the agreed interval
- Accept only when capacity triggers are tied to observed peaks and forecast headroom
Explanation
Correct Answer
C:This turns the qualitative request into a condition that can be checked using configuration-drift and compliance checks after group deployment. It directly tests the requirement to maintain consistent policies across many buildings without site-by-site scripts, while allowing the architect to identify the evidence needed at the service boundary.
Incorrect Answers
A:That success condition concerns a different requirement to shorten time to localize wireless access incidents, rather than the customer outcome at issue in a regional enterprise moving manual switch configuration into centralized operations; for requirements interpretation, the current acceptance test is configuration-drift and compliance checks after group deployment, and passing mean time to identify failing stage in repeatable fault exercises would not prove the required result: common approved settings reach in-scope devices with tracked exceptions.
B:That success condition concerns a different requirement to avoid unmanaged manual edits while retaining rollback control, rather than the customer outcome at issue in a regional enterprise moving manual switch configuration into centralized operations; for requirements interpretation, the current acceptance test is configuration-drift and compliance checks after group deployment, and passing change-log traceability and rollback after a deliberate API error would not prove the required result: common approved settings reach in-scope devices with tracked exceptions.
D:That success condition concerns a different requirement to detect user experience failures before help-desk tickets accumulate, rather than the customer outcome at issue in a regional enterprise moving manual switch configuration into centralized operations; for requirements interpretation, the current acceptance test is configuration-drift and compliance checks after group deployment, and passing controlled DNS and application faults trigger observable sensor alerts would not prove the required result: common approved settings reach in-scope devices with tracked exceptions.
E:That success condition concerns a different requirement to project future switch and WLAN capacity from measured utilization, rather than the customer outcome at issue in a regional enterprise moving manual switch configuration into centralized operations; for requirements interpretation, the current acceptance test is configuration-drift and compliance checks after group deployment, and passing forecast errors and actual headroom after a planned event would not prove the required result: common approved settings reach in-scope devices with tracked exceptions.
Question 701
A customer scenario involves a distributed campus with recurring intermittent DNS and captive-portal problems. The design objective is to detect user experience failures before help-desk tickets accumulate. Which alternative should the architect advance in the proposal meeting, with an explicit trade-off?
- Advance supported Central API automation integrated with change management to deliver faster controlled changes with improved auditability, subject to resolving the issue that rate limits and API permissions for the intended tenancy are not confirmed
- Advance HPE Aruba Networking UXI sensors and service-oriented tests to deliver proactive incident detection and shorter outages, subject to resolving the issue that sensor placement may not cover all user populations
- Advance telemetry-based capacity reporting in Central and related analytics to deliver more predictable investment timing and fewer urgent upgrades, subject to resolving the issue that seasonal ridership peaks may not be in the current data window
- Advance lifecycle and entitlement tracking joined to network inventory to deliver fewer surprise service interruptions and unplanned renewals, subject to resolving the issue that some devices are mapped to the wrong procurement cost center
Explanation
Correct Answer
B:This proposal binds an implemented mechanism to the customer’s outcome: synthetic client transactions expose end-user experience beyond simple link-up counters. Stating the unresolved condition makes the cost and risk comparison credible, while controlled DNS and application faults trigger observable sensor alerts provides a future acceptance check.
Incorrect Answers
A:This competing proposal is designed for avoid unmanaged manual edits while retaining rollback control, where API-driven workflows can standardize approved changes when access and error handling are designed; for customer proposal comparison, the present proposal must produce proactive incident detection and shorter outages, and this selection must address proactive incident detection and shorter outages with HPE Aruba Networking UXI sensors and service-oriented tests, rather than substituting the scope of supported Central API automation integrated with change management.
C:This competing proposal is designed for project future switch and WLAN capacity from measured utilization, where historical client and interface data helps estimate emerging constraints rather than relying on average loads; for customer proposal comparison, the present proposal must produce proactive incident detection and shorter outages, and this selection must address proactive incident detection and shorter outages with HPE Aruba Networking UXI sensors and service-oriented tests, rather than substituting the scope of telemetry-based capacity reporting in Central and related analytics.
D:This competing proposal is designed for avoid management and support coverage gaps across distributed sites, where licenses and support terms have to match installed assets and intended services; for customer proposal comparison, the present proposal must produce proactive incident detection and shorter outages, and this selection must address proactive incident detection and shorter outages with HPE Aruba Networking UXI sensors and service-oriented tests, rather than substituting the scope of lifecycle and entitlement tracking joined to network inventory.
Question 702
During a campus access design for a campus planning several new wiring closets for an expansion wing, the team must keep horizontal copper runs within structured cabling design limits. Which preliminary topology or solution component and associated BoM scope are the best match?
- Switch selection based on per-port PoE standard and aggregate power budget; plan validated PoE-capable switch configuration with adequate power supplies
- Fiber-plant validation and correctly matched transceiver selection; plan approved transceiver models, patch cords and cleaning supplies
- Additional telecom-room placement based on cable pathway reach; plan patch panels, racks, cable pathways and possible additional access switches
- UPS and redundant-power planning for network closets; plan UPS capacity, PDU feeds and supported redundant power options
Explanation
Correct Answer
C:The technical selection and equipment or service scope belong together: copper Ethernet reach is bounded by channel standards and installation quality. Including patch panels, racks, cable pathways and possible additional access switches ties the topology to a deliverable estimate, while walked cable routes, closet positions and actual path lengths must still be validated before the final quantities are committed.
Incorrect Answers
A:The combination addresses a requirement to avoid under-powering AP radios and uplink functions, using the supporting design principle that port capability and total available PoE power are separate constraints; for preliminary topology and bill planning, the active topology requires patch panels, racks, cable pathways and possible additional access switches, and for this site the enabling scope is patch panels, racks, cable pathways and possible additional access switches; the alternate equipment scope for switch selection based on per-port PoE standard and aggregate power budget would misalign the planned topology.
B:The combination addresses a requirement to avoid optical reach and transceiver mismatches during a switching refresh, using the supporting design principle that optical modules must match fiber characteristics, distance and platform compatibility; for preliminary topology and bill planning, the active topology requires patch panels, racks, cable pathways and possible additional access switches, and for this site the enabling scope is patch panels, racks, cable pathways and possible additional access switches; the alternate equipment scope for fiber-plant validation and correctly matched transceiver selection would misalign the planned topology.
D:The combination addresses a requirement to maintain campus access during short facility power outages, using the supporting design principle that network availability depends on sustained power to switches and upstream devices; for preliminary topology and bill planning, the active topology requires patch panels, racks, cable pathways and possible additional access switches, and for this site the enabling scope is patch panels, racks, cable pathways and possible additional access switches; the alternate equipment scope for UPS and redundant-power planning for network closets would misalign the planned topology.
Question 703
An HPE Aruba Networking architecture review concerns a large corporate campus with mobile staff crossing routed building boundaries. The customer must maintain a consistent roaming domain with centralized policy inspection. Which TWO actions form a controlled implementation workflow for this requirement? Choose TWO.
- Then introduce gateway clusters and migrate one corporate SSID at a time
- First establish current IP roaming behavior and gateway mobility capacity
- First establish device inventory and MAB behavior from representative equipment
- Then run a residence pilot with fresh and returning devices
- Then pilot representative sensors before full-floor deployment
Explanation
Correct Answers
A:This is the concrete change-control action with a bounded blast radius. Validation through continuous application sessions through inter-building roaming should gate expansion to further production segments.
B:This is the required before-state, used to identify critical scope and judge the change. The architect cannot safely plan AOS-10 tunneled SSIDs terminating on resilient gateway infrastructure without confirming the existing conditions.
Incorrect Answers
C:Those observations could inform a different requirement to provide controlled connectivity to known devices while excluding unknown MACs, yet they do not measure the condition that makes maintain a consistent roaming domain with centralized policy inspection difficult; for functional workflow mapping, this survey must first establish current IP roaming behavior and gateway mobility capacity, and collecting device inventory and MAB behavior from representative equipment does not establish the requested baseline: current IP roaming behavior and gateway mobility capacity.
D:That rollout order reduces risks when the project must authenticate eligible residents and confine unregistered devices, not the known transition hazard in this location; for functional workflow mapping, this cutover must instead plan to introduce gateway clusters and migrate one corporate SSID at a time, and the controlled action for this cutover is to introduce gateway clusters and migrate one corporate SSID at a time; the unrelated run a residence pilot with fresh and returning devices step does not reduce its dependency risk.
E:That rollout order reduces risks when the project must support RF services beyond Wi-Fi in planned locations, not the known transition hazard in this location; for functional workflow mapping, this cutover must instead plan to introduce gateway clusters and migrate one corporate SSID at a time, and the controlled action for this cutover is to introduce gateway clusters and migrate one corporate SSID at a time; the unrelated pilot representative sensors before full-floor deployment step does not reduce its dependency risk.
Question 704
A customer scenario involves a manufacturing campus whose uplinks currently block redundant paths using spanning tree. The design objective is to use parallel uplinks efficiently while reducing layer-2 fault propagation. Which item or service scope belongs in the FINAL BoM for the selected design?
- Include appropriate high-speed uplink modules and matching optics
- Include access ports, PoE supply and policy provisioning per seat
- Include aggregation switches and redundant high-speed uplinks per building
- Include routing-capable access switches and routed uplink interfaces
Explanation
Correct Answer
D:This provision enables routed layer-3 access uplinks with ECMP where supported; the underlying reason is that routed point-to-point links avoid campus-scale L2 blocking and permit multiple active equal-cost paths. The final bill must reconcile exact part or service quantities with spanning-tree topology and current uplink traffic distribution and the signed acceptance threshold, rather than copying a generic product list.
Incorrect Answers
A:That procurement dependency supports prevent access uplinks from becoming a bottleneck during recording peaks; it does not establish what is required to implement the chosen design; for final procurement reconciliation, the selected build instead depends on routing-capable access switches and routed uplink interfaces, and the required procurement provision is routing-capable access switches and routed uplink interfaces, whereas ordering for oversubscription-aware switch and uplink selection would not close the current delivery gap.
B:That procurement dependency supports support phone and PC segmentation without one physical port per device; it does not establish what is required to implement the chosen design; for final procurement reconciliation, the selected build instead depends on routing-capable access switches and routed uplink interfaces, and the required procurement provision is routing-capable access switches and routed uplink interfaces, whereas ordering for standards-aware voice VLAN and endpoint port design on AOS-CX would not close the current delivery gap.
C:That procurement dependency supports scale aggregation without one oversubscribed campus-wide layer-2 domain; it does not establish what is required to implement the chosen design; for final procurement reconciliation, the selected build instead depends on routing-capable access switches and routed uplink interfaces, and the required procurement provision is routing-capable access switches and routed uplink interfaces, whereas ordering for a three-tier campus topology with dedicated building aggregation would not close the current delivery gap.
Question 705
Consider a routed campus preparing a BGP EVPN-VXLAN fabric. The customer asks the architect to separate transport reachability from tenant overlay segmentation. A stakeholder questions why the proposal includes L3-capable links and fabric-enabled switching hardware. Which defense is technically and commercially sound?
- Link the cost to L3 VNIs and VRFs distinguish routing domains over a shared VXLAN underlay and demonstrate value through route isolation under identical private IP prefixes
- Link the cost to routed per-VRF handoff can interoperate with devices that lack VXLAN control-plane support and demonstrate value through per-VRF allowed routes and denied cross-zone traffic
- Link the cost to routed transport provides the IP paths on which VXLAN encapsulation depends and demonstrate value through VTEP reachability and equal-cost route convergence
- Link the cost to IP routing can utilize multiple equal-cost paths without relying on spanning-tree blocking and demonstrate value through path utilization and post-failure convergence
Explanation
Correct Answer
C:The proposed investment enables the chosen architecture to separate transport reachability from tenant overlay segmentation; routed transport provides the IP paths on which VXLAN encapsulation depends. A credible defense presents the testable outcome (VTEP reachability and equal-cost route convergence) and acknowledges the uncertainty that existing ACLs may block underlay control or encapsulation traffic, rather than promising zero risk.
Incorrect Answers
A:The response would defend a different purchase supporting retain independent tenant routes on shared switching infrastructure, not the questioned element of this design; for defense of the investment, the challenged component relates to L3-capable links and fabric-enabled switching hardware, and the questioned provision supports a routed OSPF underlay beneath EVPN-VXLAN overlays, with proof from VTEP reachability and equal-cost route convergence; citing VRF-backed overlay networks with independent routing tables would misstate its necessity.
B:The response would defend a different purchase supporting preserve segment isolation at a supported external boundary, not the questioned element of this design; for defense of the investment, the challenged component relates to L3-capable links and fabric-enabled switching hardware, and the questioned provision supports a routed OSPF underlay beneath EVPN-VXLAN overlays, with proof from VTEP reachability and equal-cost route convergence; citing VRF-Lite or equivalent routed external handoff at the fabric border would misstate its necessity.
D:The response would defend a different purchase supporting maintain connectivity after an underlay link fails without blocked standby trunks, not the questioned element of this design; for defense of the investment, the challenged component relates to L3-capable links and fabric-enabled switching hardware, and the questioned provision supports a routed OSPF underlay beneath EVPN-VXLAN overlays, with proof from VTEP reachability and equal-cost route convergence; citing ECMP over routed underlay links would misstate its necessity.
Question 706
A solution architect is assessing a historic office campus retaining long fiber runs between wiring closets, with a requirement to avoid optical reach and transceiver mismatches during a switching refresh. Which technical-proposal statement gives a defensible design decision and discloses the relevant dependency?
- Propose fiber-plant validation and correctly matched transceiver selection; justify it through optical modules must match fiber characteristics, distance and platform compatibility; flag that recorded fiber lengths may not reflect rerouted building paths
- Propose redundant access service zones with independent power paths where required; justify it through redundancy only helps if endpoints and upstream resources avoid shared failure points; flag that phone models may have only one network interface
- Propose closet-by-closet port and patch-panel capacity design; justify it through aggregate campus port totals do not reveal shortages in individual closets; flag that dormant ports may be mislabeled as available
- Propose additional telecom-room placement based on cable pathway reach; justify it through copper Ethernet reach is bounded by channel standards and installation quality; flag that architectural drawings omit several conduit detours
Explanation
Correct Answer
A:The proposal for fiber-plant validation and correctly matched transceiver selection connects the chosen approach to its technical mechanism and identifies that recorded fiber lengths may not reflect rerouted building paths. The plan is technically defensible because optical modules must match fiber characteristics, distance and platform compatibility; the architect should cite fiber type, measured length, connector condition and optic compatibility before final design sign-off.
Incorrect Answers
B:That written approach has a valid rationale for remove routine maintenance as a single-point outage for critical ports, but its scope misses the decision now being justified; for technical proposal drafting, the present document must specify fiber-plant validation and correctly matched transceiver selection, and a signable document instead needs fiber-plant validation and correctly matched transceiver selection and explicit resolution of recorded fiber lengths may not reflect rerouted building paths, which the suggested redundant access service zones with independent power paths where required statement does not supply.
C:That written approach has a valid rationale for avoid overlooking patch-panel and physical port capacity, but its scope misses the decision now being justified; for technical proposal drafting, the present document must specify fiber-plant validation and correctly matched transceiver selection, and a signable document instead needs fiber-plant validation and correctly matched transceiver selection and explicit resolution of recorded fiber lengths may not reflect rerouted building paths, which the suggested closet-by-closet port and patch-panel capacity design statement does not supply.
D:That written approach has a valid rationale for keep horizontal copper runs within structured cabling design limits, but its scope misses the decision now being justified; for technical proposal drafting, the present document must specify fiber-plant validation and correctly matched transceiver selection, and a signable document instead needs fiber-plant validation and correctly matched transceiver selection and explicit resolution of recorded fiber lengths may not reflect rerouted building paths, which the suggested additional telecom-room placement based on cable pathway reach statement does not supply.
Question 707
A customer scenario involves a retailer needing to quarantine endpoints identified as compromised. The design objective is to change client privileges without waiting for manual switch-port changes. Which alternative should the architect advance in the proposal meeting, with an explicit trade-off?
- Advance MAC authentication paired with restrictive ClearPass roles to deliver safer factory connectivity without replacing control hardware, subject to resolving the issue that some controllers may report duplicate or replaceable MAC addresses
- Advance ClearPass TACACS+ device-administration policy to deliver lower privileged-access risk and clearer change accountability, subject to resolving the issue that emergency local access and break-glass credentials are not documented
- Advance ClearPass dynamic authorization and restricted user roles to deliver faster containment of security incidents, subject to resolving the issue that the current access devices may not accept dynamic authorization messages
- Advance device profiling with a restrictive initial authorization role to deliver safer adoption of diverse connected healthcare devices, subject to resolving the issue that some devices reveal too little metadata for reliable fingerprinting
Explanation
Correct Answer
C:This proposal binds an implemented mechanism to the customer’s outcome: RADIUS CoA or session reauthorization can update an active endpoint's assigned access. Stating the unresolved condition makes the cost and risk comparison credible, while time-to-quarantine and proof that remediation services remain reachable provides a future acceptance check.
Incorrect Answers
A:This competing proposal is designed for admit known OT assets without granting broad campus access, where MAB can identify non-802.1X endpoints but requires compensating authorization policy; for customer proposal comparison, the present proposal must produce faster containment of security incidents, and this selection must address faster containment of security incidents with ClearPass dynamic authorization and restricted user roles, rather than substituting the scope of MAC authentication paired with restrictive ClearPass roles.
B:This competing proposal is designed for control privileged switch actions with accountable identities, where central AAA for device administration can distinguish operator permissions from endpoint network access; for customer proposal comparison, the present proposal must produce faster containment of security incidents, and this selection must address faster containment of security incidents with ClearPass dynamic authorization and restricted user roles, rather than substituting the scope of ClearPass TACACS+ device-administration policy.
D:This competing proposal is designed for restrict unknown asset types until profiling evidence becomes available, where profile-derived identity can refine access after sufficient device observations; for customer proposal comparison, the present proposal must produce faster containment of security incidents, and this selection must address faster containment of security incidents with ClearPass dynamic authorization and restricted user roles, rather than substituting the scope of device profiling with a restrictive initial authorization role.
Question 708
Consider an enterprise adding IoT asset sensors that depend on BLE and IEEE 802.15.4. The customer asks the architect to support RF services beyond Wi-Fi in planned locations. Which implementation or migration guideline most directly reduces the specified cutover risk?
- Plan to introduce gateway clusters and migrate one corporate SSID at a time
- Plan to test each intended user-role forwarding case before moving a production SSID
- Plan to consolidate one department after confirming role mapping
- Plan to pilot representative sensors before full-floor deployment
Explanation
Correct Answer
D:This stage limits exposure while the critical design premise is being checked: third-party sensor gateway integration is not validated. The recommended technical approach is AP platform selection with required IoT radios and compatible integrations; verify telemetry delivery and coexistence with Wi-Fi traffic at the planned gate before extending change scope.
Incorrect Answers
A:That rollout order reduces risks when the project must maintain a consistent roaming domain with centralized policy inspection, not the known transition hazard in this location; for migration sequence design, this cutover must instead plan to pilot representative sensors before full-floor deployment, and the controlled action for this cutover is to pilot representative sensors before full-floor deployment; the unrelated introduce gateway clusters and migrate one corporate SSID at a time step does not reduce its dependency risk.
B:That rollout order reduces risks when the project must select forwarding per user policy without multiplying SSIDs, not the known transition hazard in this location; for migration sequence design, this cutover must instead plan to pilot representative sensors before full-floor deployment, and the controlled action for this cutover is to pilot representative sensors before full-floor deployment; the unrelated test each intended user-role forwarding case before moving a production SSID step does not reduce its dependency risk.
C:That rollout order reduces risks when the project must reduce management overhead without collapsing needed security distinctions, not the known transition hazard in this location; for migration sequence design, this cutover must instead plan to pilot representative sensors before full-floor deployment, and the controlled action for this cutover is to pilot representative sensors before full-floor deployment; the unrelated consolidate one department after confirming role mapping step does not reduce its dependency risk.
Question 709
A solution architect is assessing a transit campus using network telemetry to forecast expansion rather than react to congestion, with a requirement to project future switch and WLAN capacity from measured utilization. Which technical-proposal statement gives a defensible design decision and discloses the relevant dependency?
- Propose Central client troubleshooting and correlated telemetry workflows; justify it through client-centric event visibility helps narrow which stage failed before making changes; flag that some sites lack retained telemetry for the desired lookback window
- Propose enterprise NTP and centralized logging integration; justify it through time synchronization makes cross-device event sequences meaningful during investigations; flag that several remote sites use unsynchronized local clocks
- Propose telemetry-based capacity reporting in Central and related analytics; justify it through historical client and interface data helps estimate emerging constraints rather than relying on average loads; flag that seasonal ridership peaks may not be in the current data window
- Propose Central topology correlation combined with a documented incident workflow; justify it through device and client context can reveal shared infrastructure causes of multiple alerts; flag that notification integration may duplicate alerts across monitoring tools
Explanation
Correct Answer
C:The proposal for telemetry-based capacity reporting in Central and related analytics connects the chosen approach to its technical mechanism and identifies that seasonal ridership peaks may not be in the current data window. The plan is technically defensible because historical client and interface data helps estimate emerging constraints rather than relying on average loads; the architect should cite port growth, airtime and client concurrency time series before final design sign-off.
Incorrect Answers
A:That written approach has a valid rationale for shorten time to localize wireless access incidents, but its scope misses the decision now being justified; for technical proposal drafting, the present document must specify telemetry-based capacity reporting in Central and related analytics, and a signable document instead needs telemetry-based capacity reporting in Central and related analytics and explicit resolution of seasonal ridership peaks may not be in the current data window, which the suggested Central client troubleshooting and correlated telemetry workflows statement does not supply.
B:That written approach has a valid rationale for retain time-correlated evidence across WLAN, NAC and switch components, but its scope misses the decision now being justified; for technical proposal drafting, the present document must specify telemetry-based capacity reporting in Central and related analytics, and a signable document instead needs telemetry-based capacity reporting in Central and related analytics and explicit resolution of seasonal ridership peaks may not be in the current data window, which the suggested enterprise NTP and centralized logging integration statement does not supply.
D:That written approach has a valid rationale for correlate incident evidence and prioritize customer-impacting faults, but its scope misses the decision now being justified; for technical proposal drafting, the present document must specify telemetry-based capacity reporting in Central and related analytics, and a signable document instead needs telemetry-based capacity reporting in Central and related analytics and explicit resolution of seasonal ridership peaks may not be in the current data window, which the suggested Central topology correlation combined with a documented incident workflow statement does not supply.
Question 710
During a campus access design for an industrial campus moving role-based policies between distribution buildings, the team must retain user-role tags during forwarding across the overlay. Which stakeholder should own the technical validation and be consulted before the architecture decision is approved?
- Campus fabric routing architect
- Campus high-availability fabric lead
- Industrial campus security architect
- Campus fabric performance lead
Explanation
Correct Answer
C:Industrial campus security architect is the accountable technical voice for this constraint: VXLAN GBP can carry a role-related group policy identifier inside encapsulated traffic. That owner should validate fabric node and policy-tag compatibility inventory, reconcile the outstanding issue that intermediate nonfabric nodes may strip or fail to preserve required context, and make the relevant acceptance commitment.
Incorrect Answers
A:That role can have a legitimate stake in separate transport reachability from tenant overlay segmentation, but its primary remit does not resolve the ownership decision for an industrial campus moving role-based policies between distribution buildings; for stakeholder ownership mapping, the active approval concerns retain user-role tags during forwarding across the overlay, and assigning campus fabric routing architect would leave industrial campus security architect without authority over the evidence: fabric node and policy-tag compatibility inventory.
B:That role can have a legitimate stake in maintain connectivity after an underlay link fails without blocked standby trunks, but its primary remit does not resolve the ownership decision for an industrial campus moving role-based policies between distribution buildings; for stakeholder ownership mapping, the active approval concerns retain user-role tags during forwarding across the overlay, and assigning campus high-availability fabric lead would leave industrial campus security architect without authority over the evidence: fabric node and policy-tag compatibility inventory.
D:That role can have a legitimate stake in avoid hairpinning all campus policy decisions through central gateways, but its primary remit does not resolve the ownership decision for an industrial campus moving role-based policies between distribution buildings; for stakeholder ownership mapping, the active approval concerns retain user-role tags during forwarding across the overlay, and assigning campus fabric performance lead would leave industrial campus security architect without authority over the evidence: fabric node and policy-tag compatibility inventory.